[{"data":1,"prerenderedAt":138},["ShallowReactive",2],{"glossary-page-\u002Fglossary\u002Fcycle-time":3},{"id":4,"title":5,"body":6,"description":125,"extension":126,"meta":127,"navigation":133,"path":134,"seo":135,"stem":136,"__hash__":137},"docs\u002Fglossary\u002Fcycle-time.md","Cycle Time",{"type":7,"value":8,"toc":117},"minimark",[9,15,20,35,39,42,68,72,75,89,92,96],[10,11,12],"glossary-title",{},[13,14,5],"p",{},[16,17,19],"h2",{"id":18},"what-is-cycle-time","What Is Cycle Time?",[13,21,22,25,26,30,31,34],{},[23,24,5],"strong",{}," measures how long work takes from the point active work begins until the work is completed. In software delivery, teams often define it as the time from ",[27,28,29],"code",{},"In Progress"," to ",[27,32,33],{},"Done",".",[16,36,38],{"id":37},"why-cycle-time-matters","Why Cycle Time Matters",[13,40,41],{},"Cycle Time helps teams:",[43,44,45,52,58,63],"ul",{},[46,47,48,51],"li",{},[23,49,50],{},"spot bottlenecks"," in development, review, testing, or release steps,",[46,53,54,57],{},[23,55,56],{},"improve flow predictability",",",[46,59,60,57],{},[23,61,62],{},"estimate delivery more realistically",[46,64,65,34],{},[23,66,67],{},"understand throughput without relying only on output volume",[16,69,71],{"id":70},"how-to-use-cycle-time","How To Use Cycle Time",[13,73,74],{},"Cycle Time becomes more useful when teams:",[43,76,77,80,83,86],{},[46,78,79],{},"define workflow states clearly,",[46,81,82],{},"track trends over time instead of single outliers,",[46,84,85],{},"compare wait time versus active work time,",[46,87,88],{},"pair it with quality and reliability metrics.",[13,90,91],{},"Cycle Time is a flow metric. It does not replace DORA metrics, but it complements them.",[16,93,95],{"id":94},"related-terms","Related Terms",[43,97,98,105,111],{},[46,99,100],{},[101,102,104],"a",{"href":103},"\u002Fglossary\u002Flead-time-for-changes","Lead Time For Changes",[46,106,107],{},[101,108,110],{"href":109},"\u002Fglossary\u002Fdeployment-frequency","Deployment Frequency",[46,112,113],{},[101,114,116],{"href":115},"\u002Fglossary\u002Fvalue-stream-mapping","Value Stream Mapping",{"title":118,"searchDepth":119,"depth":119,"links":120},"",2,[121,122,123,124],{"id":18,"depth":119,"text":19},{"id":37,"depth":119,"text":38},{"id":70,"depth":119,"text":71},{"id":94,"depth":119,"text":95},"Cycle Time measures how long work takes from active start to completion, helping teams find bottlenecks and improve delivery flow.","md",{"category":128,"tags":129},"C",[130,131,132],"Engineering Metrics","Flow Metrics","Developer Productivity",true,"\u002Fglossary\u002Fcycle-time",{"title":5,"description":125},"glossary\u002Fcycle-time","7BQPXc-G_NEQfTIQ-_d53ZwlrqYV9xQn17u6eR1HPig",1775216701226]