[{"data":1,"prerenderedAt":125},["ShallowReactive",2],{"glossary-page-\u002Fglossary\u002Fengineering-velocity":3},{"id":4,"title":5,"body":6,"description":112,"extension":113,"meta":114,"navigation":120,"path":121,"seo":122,"stem":123,"__hash__":124},"docs\u002Fglossary\u002Fengineering-velocity.md","Engineering Velocity",{"type":7,"value":8,"toc":104},"minimark",[9,15,20,27,31,34,55,59,62,76,79,83],[10,11,12],"glossary-title",{},[13,14,5],"p",{},[16,17,19],"h2",{"id":18},"what-is-engineering-velocity","What Is Engineering Velocity?",[13,21,22,26],{},[23,24,25],"strong",{},"Engineering velocity"," describes how consistently a team turns planned work into delivered outcomes over time. Depending on the organization, it may be measured through completed work, shipped value, or a combination of flow and delivery indicators.",[16,28,30],{"id":29},"why-engineering-velocity-matters","Why Engineering Velocity Matters",[13,32,33],{},"Velocity can be useful when it helps teams:",[35,36,37,44,49],"ul",{},[38,39,40,43],"li",{},[23,41,42],{},"forecast capacity more realistically",",",[38,45,46,43],{},[23,47,48],{},"spot delivery instability early",[38,50,51,54],{},[23,52,53],{},"understand whether planning and execution are aligned",".",[16,56,58],{"id":57},"how-to-use-engineering-velocity-correctly","How To Use Engineering Velocity Correctly",[13,60,61],{},"Velocity should be used carefully. It is most useful:",[35,63,64,67,70,73],{},[38,65,66],{},"as a planning and trend signal,",[38,68,69],{},"when interpreted over multiple iterations,",[38,71,72],{},"when paired with quality and reliability metrics,",[38,74,75],{},"when not used as a simplistic productivity score for individuals.",[13,77,78],{},"Velocity without context can become misleading. Fast output is not the same as valuable or reliable delivery.",[16,80,82],{"id":81},"related-terms","Related Terms",[35,84,85,92,98],{},[38,86,87],{},[88,89,91],"a",{"href":90},"\u002Fglossary\u002Fcycle-time","Cycle Time",[38,93,94],{},[88,95,97],{"href":96},"\u002Fglossary\u002Fdeployment-frequency","Deployment Frequency",[38,99,100],{},[88,101,103],{"href":102},"\u002Fglossary\u002Ftechnical-debt","Technical Debt",{"title":105,"searchDepth":106,"depth":106,"links":107},"",2,[108,109,110,111],{"id":18,"depth":106,"text":19},{"id":29,"depth":106,"text":30},{"id":57,"depth":106,"text":58},{"id":81,"depth":106,"text":82},"Engineering velocity describes how consistently a team turns planned work into delivered outcomes over time.","md",{"category":115,"tags":116},"E",[117,118,119],"Engineering Metrics","Planning","Developer Productivity",true,"\u002Fglossary\u002Fengineering-velocity",{"title":5,"description":112},"glossary\u002Fengineering-velocity","fUMPZ_NBhdS-d_br6SuB2WHiJ5QfDi5ozbRVaVT4msw",1775216701510]